The Hocking
County Engineer's Office requires permits for all work done within a
road's right-of-way.
Permits are required for installation of a driveway; utility work
consisting of road cuts, bore pits and trenching within the
right-of-way; tapping into roadside drainage tiles; and hauling
overweight items.
Some permit applications may include a performance bond to ensure proper
procedures are followed.
To apply for a permit, click on the appropriate link below to download
an application. Bring or mail the application to:
The Hocking County Engineer's Office
1286 California Avenue
Logan, Ohio 43138
Office Hours: 7:00-3:30 Monday-Friday
Phone - (740) 385-8543
Fax - (740) 385-0542
|
Underground Construction on Hocking
County Right-of-Way: |
 |
|
Load Limit
Permit: |
 |
|
Road Repair
Agreement: |
 |
|
Driveway &
Roadside Pipe Policy (Permit):
|
 |
FROST LAW:
EFFECTIVE FEBRUARY 1, 2012 THE LEGAL LOAD LIMIT ON ALL HOCKING
COUNTY ROADS WILL BE REDUCED BY 50% WITH THE EXCEPTION OF COUNTY ROAD
33A, CHIEFTAIN DRIVE, COUNTY ROAD 33B, HOCKING DRIVE AND COUNTY ROAD 25,
HAYDENVILLE ROAD.
THIS
LEGAL LOAD LIMIT REDUCTION WILL BE IN EFFECT FROM FEBRUARY 1, 2012
TO APRIL 30, 2012.
BY
CLICKING ON THE ROAD REPAIR AGREEMENT ABOVE, YOU MAY DOWNLOAD THE
NECESSARY APPLICATION FORM AND MAIL OR FAX TO THE HOCKING COUNTY
ENGINEER'S OFFICE, 1286 CALIFORNIA AVENUE, LOGAN, OHIO 43138 OR FAX
740-385-0542
|